Globino City | Ukrain

Project director: Ir. J.H. (Jan) Zengerink

At a biogas plant in Globino City (Ukrain), our installation team successfully finished the installation of 2 Double Membrane covers. The Double Membrane covers have a diameter of Ø22,0 m. Our installation team finished the project in less than a week!

Products:

  • Two Double Membrane cover Ø22,0 meter

Specifications:

  • Gas production/withdrawal: 750 m3/h (flexible volume per tank)
  • Yearly production: 13.140.000 m3
  • Average family uses: 1650 m3/day
  • This installation can power: +/- 7964 households!

Membranes used:

  • Inner membrane: 900 grs./m2
  • Outer membrane: 900 grs./m2
  • High frequently welded
  • Radial design (higher membranes/shape)