Globino City | Ukrain
At a biogas plant in Globino City (Ukrain), our installation team successfully finished the installation of 2 Double Membrane covers. The Double Membrane covers have a diameter of Ø22,0 m. Our installation team finished the project in less than a week!
Products:
- Two Double Membrane cover Ø22,0 meter
Specifications:
- Gas production/withdrawal: 750 m3/h (flexible volume per tank)
- Yearly production: 13.140.000 m3
- Average family uses: 1650 m3/day
- This installation can power: +/- 7964 households!
Membranes used:
- Inner membrane: 900 grs./m2
- Outer membrane: 900 grs./m2
- High frequently welded
- Radial design (higher membranes/shape)